Wednesday, 21 March 2018
template designed by
Recently Published Items
Main Menu
Association Newsletter
Member Statistics
RH/PB Roster
Web Links
Unit Histories
Horse Talk Forum
RHPBA Photo Archive
DOD Casualty Reports
About Us
Members: 711
News: 265
Web Links: 40
Visitors: 3853818

RHA on Twitter

REDHORSE Association
REDHORSE Association
Promote Your Page Too

REDHORSE Association's items Go to REDHORSE Association's photostream


Welcome to the RED HORSE and Prime BEEF Association

An Association of Past and Present Members of Prime BEEF and RED HORSE

"Let's make us greater, together"

Active Image

Click on the photo above to view the latest newsletter


The RED HORSE and Prime BEEF Association was formed in 2001 as it was determined there was a need for all USAF Combat Civil Engineers to remain in touch, re-establish old friendships, create new ones, perpetuate our spirit and traditions, represent the interests, provide a fraternal atmosphere, encourage social interaction, develop a scholarship fund and support our members in their time of need.
Our Mission is to increase awareness of the USAF Combat Civil Engineers accomplishments and tradition of excellence past and present during war and peace time with the American populace, preserve our proud heritage, share our legacy and to foster strong and mutually beneficial relationships among government, educational and civic leaders. It is our desire to be a significant force of support towards the USAF CE strategic mission, to be able to contribute to the over all morale and enhance the welfare of our profession.
We are a non-profit, tax exempt, non-commercial professional military association that exists to support, promote and develop the interests of all past, present, Active, AFRC and ANG USAF Combat Civil Engineer professionals.
Membership applications are available on this web site (the second red tab on the top left of this page) or feel free to contact us for more information.
Stanley Irwin, President
RED HORSE and Prime BEEF Association


554th RHS adapts durable, cost effective tilt-up construction technique PDF Print E-mail
on Thursday, 04 December 2008

Views : 4442    

Published in : , Latest News

by Airman 1st Class Courtney Witt
36th Wing Public Affairs

11/24/2008 - ANDERSEN AIR FORCE BASE, Guam -- Keeping in mind Guam's stringent construction codes designed to withstand intense winds and earthquake, engineers from the 554th RED HORSE Squadron here adapted a time-proven tilt-up construction technique that's extremely durable and cost effective. 

Tilt-up construction describes the process where engineers cast slabs of concrete, which will become the wall sections, horizontally on a casting slab. Then, after attaining sufficient strength, the walls are lifted with a crane and set on prepared foundations to form the exterior, and sometimes, interior walls. 

When the 554th RHS realized tilt-up construction was the best practice to use on Guam, they turned to industry leaders in Las Vegas for a week-long course and on Guam for additional instruction.

"My Airmen went through the American Concrete Institute training and certification program then partnered with Black Construction and Rocky Mountain Precast to learn the 'tricks of the trade," said Lt. Col. Anthony Davit, 554th RED HORSE Squadron commander.

"We are the first RED HORSE unit to regularly employ tilt-up as a construction method," said Capt. April Bowman, 554th RHS engineer. "We have gone with tilt-up as opposed to the more common poured-in-place walls because this reduces the amount of wood we need for formwork, which is quicker and more economical." 

Colonel Davit said tilt-up construction is the most prevalent form of construction used at Northwest Field 

"We have tilted-up two full buildings," added Captain Bowman explaining that more are currently under construction. "The largest panel so far was 22 tons and 26.5 feet tall."

Tilt-up construction is one of the fastest growing industries in the United States due to the economics of the technique which combines practical cost with low maintenance, durability, and speed of construction.

According to, the technique was developed in the early 1900s and the first tilt-up building constructed was a concrete factory near Zion City, Illinois. Soon after, Thomas Edison realized that tilt-up construction was the way of the future. In 1908 in Union, N.J., he created an entire village of tilt-up concrete houses that are still standing 100 years later.

The construction technique became prominent after World War II with the advent of ready mix concrete, mobile crane, concrete pump, improved lifting and bracing hardware, and new finishing techniques.

Since the 1940s, tilt-up construction has undergone several innovations and improvements and many top concrete and general contractors in the commercial construction industry have adopted the technique.

Web version: 

Last update: Thursday, 04 December 2008

Quote this article in website
Send to friend
Related articles

User comments  

Average user rating

   (0 vote)


Display 0 of 0 comments

Add your comment

Only registered users can comment an article. Please login or register.

No comment posted

mXcomment 1.0.1 © 2007-2018 -
License Creative Commons - Some rights reserved
< Prev   Next >
Association members, Email us to get your web site logon.
Users Currently Online
No Users Online

America Supports You

Never Forgotten

Airman Heritage Museum


REDHORSE Association Photo Archive

Air Force in Iraq

Military Chapel

© 2018 RED HORSE and Prime BEEF Association
Joomla! is Free Software released under the GNU/GPL License.

Get The Best Free Joomla Templates at